Skip to main content

  • 简体中文
  • English

Download DMS Data Processing Tools

System Requirements

The DMS Data Processing Tools require Microsoft Excel. Excel 2003 and 2007 are supported.

Current Versions

The current version of the Office utilities is 6.1

Comments and feedback on all versions is welcomed by email to support@cambustion.com

Installation Instructions

Download and run the Microsoft Installer program. dmsutilitiesv61

Follow the prompts to install the utilities.

Known Issues

DMS Utilities run slowly on Office 2007

It has been observed that DMS Utilties run very slowly in Excel 2007. Performance is greatly improved by installing Office 2007 Service Pack 2.

DMS Utilities do not work with fractional realtime

Data logged in a DMS file with a realtime timestamp can be misinterpreted by Excel as a "general" or "text" format if the timestamps contain fractions of seconds. The DMS Utilities generate an error unless the timestamps are formatted correctly and may be interpreted as a number.

Workaround: The following sequence of Excel commands will force Excel to interpret the realtime timestamps as a DateTime by adding zero to each timestamp:

  1. Enter 0 in an empty cell (cell F1 is used in this example)
  2. Set cell F1's cell format to "Time" using Format→Cells
  3. Select cell F1 and copy it to the clipboard (Ctrl+C, or Edit→Copy)
  4. Select all the timestamps in column1 from A7 to the end (Ctrl+Shift+Down arrow)
  5. Edit→Paste special, selection "Paste All" and "Operation Add"
  6. Cell F1 can now be cleared.

Feedback

Comments and suggestions for improvements to the DMS Utilities are always welcome. Please address these by email to the Cambustion Product Support Group at support@cambustion.com